Projects handled
over the years include:

Building Projects

Construction of a Health Science Building, Utility Block and Associated External Works at Muni University

Scope of Works Undertaken; involves construction of a 3 storied structure, a utility building, associated external works; electrical and mechanical works

Rehabilitation and Expansion of Facilities at Sacred Heart S. S and St. Joseph College Layibi (Lot 20)

Scope of Works undertaken; involved construction of Storied Dormitory, Main hall, Libraries (128 and 300 capacity), Toilets, Staff Houses external works, Electrical and Mechanical installations.

Construction of One Stop Boarder Post at Mutukula

Scope of Works; Freight Building (2,318m2 ), Cargo Verification Building(1,967m2 ), Staff houses (25No – 1,450m2 ), Passenger Vehicle Shed 480m2 ), Parking (1,260m2 ), Road & drive ways (9,530m2 ), Boundary wall (900m), Drainage

Construction of 1 No. Library and 4No. Laboratories in Adjumani, Moyo, Nebbi, Yumbe Districts for Lot 1

Scope of Works; Construction of libraries and laboratories

Construction of 3 Nos. Libraries and 7Nos. Laboratories in Lubani, Wanyange, Kamuli, Luzinga, Bubinga, Dabani, Mulagi, Bunya for Lot 3

Scope of Works; Construction of classrooms, libraries, laboratories,and administration blocks

Rehabilitation of Selected Buildings at Uganda Industrial Research Institute – Nakawa (UIRI)

Scope of Works; Remodeling of the engineering workshop and Microbiology laboratory

Construction of Ngora Livestock Market, market roads, Kumi slaughter Shed, Agu Cattle Crush, Akworo Akero Cattle Crush and Opeeta Cattle Crush in Kumi District

Scope of Works; Construction of Livestock Markets, slaughter houses , market roads and alike

Construction of Police Headquarters offices, Goma – Congo (La construction du Commissariat Provinciale de la PNC au Nord Kivu - Goma Lot 1)

Scope of Works undertaken; Construction of Police Headquarters offices, Goma – Congo

Roads, Solar Energy works, Water Distribution & Bridge Projects

Construction of Wadelai Irrigation Scheme Infrastructure and Facilities in Nebbi District

Scope of works; Earth impounding Structures, Storage Reservoirs, Hydraulic and Flood Control Structures, Canal and Drainage System, Access Roads and Scheme Facilities.

Supply and Installation of Solar Energy Packages for Water Supply Scheme in the North Eastern region in Kaabong, Karenga, Torima, Magoro, Usuk and Kamod

Scope of works; Supply & Installation of Solar Energy Packages for Water Supply Schemes ( solar modules, power invertors, power controllers, water pumps, Spi-Array tester, Alarm systems, electric cables etc), construction of eco-san toilets and RC fence among others in the North Eastern Region

Construction and Installation of Energy (solar) packages for water supply schemes – Lot 2A

Scope of works; Supply and Installation of Solar panels, Inverters to rural growth centre, construction of water lines and kiosks.

Supply and Installation of Pumping System (Submersible and Centrifugal pump) for Katakwi & Kasamya Projects – Lot 2C

Scope of works; installing submersible and Centrifugal pump – Eastern Uganda

Rehabilitation/ Reconstruction of Mubuku Irrigation Scheme Lot 2 – JV

Scope of works undertaken; 36km primary and secondary roads, Earth embankment Reservoir, reinforced concrete main canal & lateral canal, Diversion weir 1 & 2 comprising of 2No. reinforced concrete downstream and upstream embankment walls (weirs), refurbishment of existing scheme office

Upgrading Bagambaki and Kitimbo Roads to Bitumen Standards (Surface Dressing) in Kisenyi II Parish

Scope of works undertaken; Clearing & grubbing of work areas, Grouted stone pitching to side drains , formation of carriageway & shoulders, Surface Dressing

Periodic Maintenance of Kakukuru – Rubaale Road

Scope of works undertaken; Drainage works, grading Gravelling of the wearing course, stone pitching of selected side drains , culvert laying

Term Maintenance of Nyakahita – Rushere – Rwakitura (45km), involving Grading, gravelling and drainage works like culvert installation and stone pitching

Scope of works undertaken; Gravelling, grading and laying a new wearing course, Armco Culvert laying, concrete culvert laying, drainage works and stone pitching

Construction of Bridges in North West Uganda – Goli & Nyagak Bridges Lot 2

Scope of works: Drainage, Earthworks and pavement layers of gravel or crushed stone, ancillary road works, Structures and Tolerance, testing and quality control

Construction of Kaguta Bridge in Lira District

Scope of works: Drainage, Earthworks and pavement layers of gravel or crushed stone, ancillary road works, Structures and Tolerance, testing and quality control

Term Maintenance of Kapchorwa-Suam (77km), Bumbobi- Bubulo (16km), Bubulo-Busumbu (16km) and Bubulo-Bududa (28km)

Scope of works: Grading, Spot gravelling and drainage improvement

Term Maintenance of 24 selected roads under 11 lots- lot9 MuyembeNamalu (65kms), Girik River- Bukwo (30kms), Chipsikunya- Girik River (26.1kms)

Scope of works: Grading, Spot gravelling and drainage

Ongoing Projects

Construction of irrigation scheme Infrastructure and Facilities in Nebbi district

Scope of works; Earth impounding Structures, Storage Reservoirs, Hydraulic and Flood Control Structures, Canal and Drainage System, Access Roads and Scheme Facilities

Construction of Aleles Bridge in Pallisa district.

Construction of 100m span bridge consisting of reinforced concrete abutments inclusive of piles, piers, and deck, and design, fabrication and supply of a truss girder system.

Construction Of Namiganda Multipurpose Dam And Development Of Igogero-Naigombwa Irrigation Scheme In Bugiri And Bugweri Districts

The construction of two multipurpose dams and an extensive canal network will enable efficient water control and supply, bolstering the region’s agricultural capabilities and ensuring long-term growth and sustainability.